PMWX - PMWX Control WT Explosion
Production Management
Current Version
Version 7.30
Last Modified: May 06, 2025
Required Modules: P/M
Compatible with Sage Service Update: 2024 (7.30) PU0, PU1, PU2
Call (858) 550-5900
PMWX is designed to allow control over Bill of Material subassembly component explosion during Work Ticket Entry. New Work Ticket and Bill of Material settings have been added to control when bill items will be issued from stock instead.
In Work Ticket Entry, ‘Explode Bill Subassemblies’ new Control Explosion option must be selected and can be set as a default in Production Management Options. When selected, Work Ticket material requirements will check the new Do not Explode checkbox in Bill of Materials on the Header tab for all components or the Lines tab component line in the secondary grid for subassemblies.
Additionally, a new Production Management Option ‘Prompt to delete from Work Ticket History’ makes it possible to reuse Work Ticket numbers and is selected at time of deletion. Only Work Tickets with no transactions updated to them will be removed.